Back to ProjectsCommercial / Electrical
NPF Building — Main Switchboard Upgrade
ClientNPF / PPI IndustriesMain ContractorGEL (Main Contractor)DurationJuly 2019 (5 days)

Project Overview
GEL designed, fabricated, and installed a new main switchboard (MSB) at the NPF Building, including full disconnection of mains and sub-mains cabling, removal of the old ATS and MSB, installation of the new board, and reconnection and metering.
Delivered by our Guadalcanal Electrics Ltd labour division, this project reflects the standards of safety, quality, and operational continuity that Traverse brings to every assignment — from major infrastructure to fast-turnaround commercial work.
Gallery
Project images



Start a Project